Submitted by Eric on Sat, 04/09/2011 - 20:25
Well I finally got my bulkheads put in. I got the shut offs installed and put some water in the overflows to check them for any leaks. Everything seems fine and dry after several days.
Some plumbing parts. Everyone loves pictures so why not include these!
Assembly of the drain lines
Drain installed
At least to the outside of the stand!